Fr. 5.-¹ Rabatt bei Bestellungen per App
Gleich Code kopieren:

Shield Tunnel Cutter Replacement Technology / Key Technologies for Tunnel Construction under Complex Geological and Environmental Conditions (PDF)

(Sprache: Englisch)
 
 
Merken
Merken
 
 
This book proposes the tool change methods for the excessive tool wear in the construction rules of shield tunnel construction in China. From the perspective of shield tunneling, atmospheric pressure tool change, pressure opening and tool change, and other...
sofort als Download lieferbar

Bestellnummer: 140016551

Printausgabe Fr. 165.50
eBook (pdf) Fr. 118.00
inkl. MwSt.
Download bestellen
Verschenken
 
  •  
     
     
     
     
  •  
     
     
     
     
  •  
     
     
     
     
  •  
     
     
     
     
  •  
     
     
     
     
  •  
     
     
     
     
 
  •  
     
     
     
     
  •  
     
     
     
     
  •  
     
     
     
     
  •  
     
     
     
     
  •  
     
     
     
     
  •  
     
     
     
     
 
  •  
     
     
     
     
  •  
     
     
     
     
  •  
     
     
     
     
  •  
     
     
     
     
  •  
     
     
     
     
  •  
     
     
     
     
Kommentar zu "Shield Tunnel Cutter Replacement Technology / Key Technologies for Tunnel Construction under Complex Geological and Environmental Conditions"
 
  •  
     
     
     
     
  •  
     
     
     
     
  •  
     
     
     
     
  •  
     
     
     
     
  •  
     
     
     
     
  •  
     
     
     
     
 
  •  
     
     
     
     
  •  
     
     
     
     
  •  
     
     
     
     
  •  
     
     
     
     
  •  
     
     
     
     
  •  
     
     
     
     
0 Gebrauchte Artikel zu „Shield Tunnel Cutter Replacement Technology / Key Technologies for Tunnel Construction under Complex Geological and Environmental Conditions“
Zustand Preis Porto Zahlung Verkäufer Rating