Time-To-Build / Lecture Notes in Economics and Mathematical Systems Bd.420 (PDF)
Interrelated Investment and Labour Demand Modelling With Applications to Six OECD Countries
(Sprache: Englisch)
As large physical capital stock projects need long periods to be built, a time-to-build specification is incorporated in factor demand models. Time-to-build and adjustment costs dynamics are identified since by the first moving average dynamics, whereas by...
sofort als Download lieferbar
eBook (pdf)
Fr. 59.00
inkl. MwSt.
- Kreditkarte, Paypal, Rechnung
- Kostenloser tolino webreader
Produktdetails
Produktinformationen zu „Time-To-Build / Lecture Notes in Economics and Mathematical Systems Bd.420 (PDF)“
As large physical capital stock projects need long periods to be built, a time-to-build specification is incorporated in factor demand models. Time-to-build and adjustment costs dynamics are identified since by the first moving average dynamics, whereas by the latter autoregressive dynamics are induced. Empirical evidence for time-to-build is obtained from data from the Dutch construction industry and by the estimation result from the manufacturing industry of six OECD countries.
Bibliographische Angaben
- Autor: Marga Peeters
- 2012, 1995, 204 Seiten, Englisch
- Verlag: Springer Berlin Heidelberg
- ISBN-10: 3642468152
- ISBN-13: 9783642468155
- Erscheinungsdatum: 06.12.2012
Abhängig von Bildschirmgrösse und eingestellter Schriftgrösse kann die Seitenzahl auf Ihrem Lesegerät variieren.
eBook Informationen
- Dateiformat: PDF
- Grösse: 17 MB
- Ohne Kopierschutz
- Vorlesefunktion
Sprache:
Englisch
Kommentar zu "Time-To-Build / Lecture Notes in Economics and Mathematical Systems Bd.420"
0 Gebrauchte Artikel zu „Time-To-Build / Lecture Notes in Economics and Mathematical Systems Bd.420“
Zustand | Preis | Porto | Zahlung | Verkäufer | Rating |
---|
Schreiben Sie einen Kommentar zu "Time-To-Build / Lecture Notes in Economics and Mathematical Systems Bd.420".
Kommentar verfassen