Repair and rehabilitation of a cable stayed bridge (PDF)
Case study of a bridge across the Chambal River (Kota)
(Sprache: Englisch)
Master's Thesis from the year 2011 in the subject Engineering - Civil Engineering, grade: 10, , language: English, abstract: In the present study, the failure of cable stayed bridge across Chambal River (Kota) will be discussed. The causes of its collapse...
sofort als Download lieferbar
eBook (pdf)
Fr. 37.00
inkl. MwSt.
- Kreditkarte, Paypal, Rechnung
- Kostenloser tolino webreader
Produktdetails
Produktinformationen zu „Repair and rehabilitation of a cable stayed bridge (PDF)“
Master's Thesis from the year 2011 in the subject Engineering - Civil Engineering, grade: 10, , language: English, abstract: In the present study, the failure of cable stayed bridge across Chambal River (Kota) will be discussed. The causes of its collapse and detail study of the cable stayed bridge cross Chambal River will be done. The static and dynamic modeling of cable stayed bridge is also done. At the end, the measure to repair and rehabilitation cable stayed is discussed.
Cable stayed bridge has become one of the most frequently used bridge system throughout the world because of their aesthetic appeal, structural efficiency, enhanced stiffness compared with suspension bridge, ease of construction and small size of substructure. Over past 40 years, rapid developments have been made on modern cable stayed bridge. With main span length increasing , more shallow and slender stiffness girders used in modern cable stayed bridge, the safety of whole bridge under service loading and environmental dynamic loading such as impact , wind and earthquake loadings , presents increasingly important concern in design , construction and service
In India the first cable stayed bridge was AKKAR BRIDGE, SIKKIM (1985) Constructed by Gammon India limited. The other cable stayed bridge are Vidhya sagar Setu (1992) Kolkata, Bandra - worli sea link (Mumbai), Cable stayed bridge across Chambal river (Kota) etc.
Cable stayed bridge has become one of the most frequently used bridge system throughout the world because of their aesthetic appeal, structural efficiency, enhanced stiffness compared with suspension bridge, ease of construction and small size of substructure. Over past 40 years, rapid developments have been made on modern cable stayed bridge. With main span length increasing , more shallow and slender stiffness girders used in modern cable stayed bridge, the safety of whole bridge under service loading and environmental dynamic loading such as impact , wind and earthquake loadings , presents increasingly important concern in design , construction and service
In India the first cable stayed bridge was AKKAR BRIDGE, SIKKIM (1985) Constructed by Gammon India limited. The other cable stayed bridge are Vidhya sagar Setu (1992) Kolkata, Bandra - worli sea link (Mumbai), Cable stayed bridge across Chambal river (Kota) etc.
Bibliographische Angaben
- Autor: Rajshree Charan
- 2019, 1. Auflage, 96 Seiten, Englisch
- Verlag: GRIN Verlag
- ISBN-10: 3668925585
- ISBN-13: 9783668925588
- Erscheinungsdatum: 17.04.2019
Abhängig von Bildschirmgrösse und eingestellter Schriftgrösse kann die Seitenzahl auf Ihrem Lesegerät variieren.
eBook Informationen
- Dateiformat: PDF
- Grösse: 14 MB
- Ohne Kopierschutz
- Vorlesefunktion
Sprache:
Englisch
Kommentar zu "Repair and rehabilitation of a cable stayed bridge"
0 Gebrauchte Artikel zu „Repair and rehabilitation of a cable stayed bridge“
Zustand | Preis | Porto | Zahlung | Verkäufer | Rating |
---|
Schreiben Sie einen Kommentar zu "Repair and rehabilitation of a cable stayed bridge".
Kommentar verfassen