Liquidated Damages and Extensions of Time (PDF)
In Construction Contracts
(Sprache: Englisch)
Liquidated damages and extensions of time are complex subjects,
frequently forming the basis of contract claims made under the
standard building and civil engineering contracts. Previous
editions of Liquidated Damages and Extensions of Time are
highly...
frequently forming the basis of contract claims made under the
standard building and civil engineering contracts. Previous
editions of Liquidated Damages and Extensions of Time are
highly...
sofort als Download lieferbar
eBook (pdf)
Fr. 110.00
inkl. MwSt.
- Kreditkarte, Paypal, Rechnung
- Kostenloser tolino webreader
Produktdetails
Produktinformationen zu „Liquidated Damages and Extensions of Time (PDF)“
Liquidated damages and extensions of time are complex subjects,
frequently forming the basis of contract claims made under the
standard building and civil engineering contracts. Previous
editions of Liquidated Damages and Extensions of Time are
highly regarded as a guide for both construction industry
professionals and lawyers to this complex area.
The law on time and damages continues to develop with an
increasing flow of judgments from the courts. Alongside this, the
standard forms of contract have also developed over time to reflect
prevailing approaches to contractual relationships. Against this
background a third edition will be welcomed by construction
professionals and lawyers alike. Retaining the overall approach of
the previous editions, the author clarifies, in a highly readable
but legally rigorous way, the many misunderstandings on time and
damages which abound in the construction industry. The third
edition takes account of a large volume of new case law since the
previous edition was published over ten years ago, includes a new
chapter on delay analysis and features significantly expanded
chapters on penalty clauses, the effects of conditions precedent
and time-bars, and the complexities of causation.
frequently forming the basis of contract claims made under the
standard building and civil engineering contracts. Previous
editions of Liquidated Damages and Extensions of Time are
highly regarded as a guide for both construction industry
professionals and lawyers to this complex area.
The law on time and damages continues to develop with an
increasing flow of judgments from the courts. Alongside this, the
standard forms of contract have also developed over time to reflect
prevailing approaches to contractual relationships. Against this
background a third edition will be welcomed by construction
professionals and lawyers alike. Retaining the overall approach of
the previous editions, the author clarifies, in a highly readable
but legally rigorous way, the many misunderstandings on time and
damages which abound in the construction industry. The third
edition takes account of a large volume of new case law since the
previous edition was published over ten years ago, includes a new
chapter on delay analysis and features significantly expanded
chapters on penalty clauses, the effects of conditions precedent
and time-bars, and the complexities of causation.
Autoren-Porträt von Brian Eggleston
Brain Eggleston CEng, FICE, FIStructE, FCIArb, is achartered arbitrator with extensive UK and international experience
and a past President of the Chartered Institute of Arbitrators. He
also acts as an adjudicator and mediator and as an adviser to
contractors and employers on contractual matters. He is well known
as an author and seminar speaker on contract law and standard
forms.
In a career spanning over 40 years he has worked on all sides of
the construction industry, firstly as a bridge designer, then as a
resident engineer and contracts administrator, and subsequently as
a director of various building and civil engineering contracting
companies.
Bibliographische Angaben
- Autor: Brian Eggleston
- 2009, 3. Auflage, 408 Seiten, Englisch
- Verlag: John Wiley & Sons
- ISBN-10: 1444301632
- ISBN-13: 9781444301632
- Erscheinungsdatum: 26.01.2009
Abhängig von Bildschirmgrösse und eingestellter Schriftgrösse kann die Seitenzahl auf Ihrem Lesegerät variieren.
eBook Informationen
- Dateiformat: PDF
- Grösse: 2.03 MB
- Mit Kopierschutz
Sprache:
Englisch
Kopierschutz
Dieses eBook können Sie uneingeschränkt auf allen Geräten der tolino Familie lesen. Zum Lesen auf sonstigen eReadern und am PC benötigen Sie eine Adobe ID.
Kommentar zu "Liquidated Damages and Extensions of Time"
0 Gebrauchte Artikel zu „Liquidated Damages and Extensions of Time“
Zustand | Preis | Porto | Zahlung | Verkäufer | Rating |
---|
Schreiben Sie einen Kommentar zu "Liquidated Damages and Extensions of Time".
Kommentar verfassen