GERT Networks and the Time-Oriented Evaluation of Projects / Lecture Notes in Economics and Mathematical Systems Bd.172 (PDF)
(Sprache: Englisch)
Towards the end of the fifties methods for planning, scheduling,and control of proj ects were developed on the basis that the evolution of a project can be associated with a special weighted directed graph, called activity network. In this association, the...
sofort als Download lieferbar
eBook (pdf)
Fr. 59.00
inkl. MwSt.
- Kreditkarte, Paypal, Rechnung
- Kostenloser tolino webreader
Produktdetails
Produktinformationen zu „GERT Networks and the Time-Oriented Evaluation of Projects / Lecture Notes in Economics and Mathematical Systems Bd.172 (PDF)“
Towards the end of the fifties methods for planning, scheduling,and control of proj ects were developed on the basis that the evolution of a project can be associated with a special weighted directed graph, called activity network. In this association, the individual activities of the project correspond to the arcs, the so-called proj ect events (beginning or termination of activities) correspond to the nodes, and the durations of the activities correspond to the weights of the respective arcs of the directed graph. 1) Contiguous arcs are assigned to activities which succeed one another immediately. The event corresponding to a node occurs exactly at the time at which all activities which are associated with the arcs leading into the node are terminated. After the occurrence of an event all those activities are be gun which correspond to the arcs emanating from the respective node. This implies especially that the evolution of the project has to be uniquely determined before hand, that every activity and every event are realized exactly once during the exe cution of the project, and that "feedback" (corresponding to cycles in the asso ciated network) is not permitted. Many projects, for example most R&D projects and projects in the area of production p 1 anni ng, do not sa ti sfy the foregoi ng res tri cti ons.
Bibliographische Angaben
- Autoren: K. Neumann , U. Steinhardt
- 2012, 1979, 272 Seiten, Englisch
- Verlag: Springer Berlin Heidelberg
- ISBN-10: 3642953638
- ISBN-13: 9783642953637
- Erscheinungsdatum: 06.12.2012
Abhängig von Bildschirmgrösse und eingestellter Schriftgrösse kann die Seitenzahl auf Ihrem Lesegerät variieren.
eBook Informationen
- Dateiformat: PDF
- Grösse: 15 MB
- Ohne Kopierschutz
- Vorlesefunktion
Sprache:
Englisch
Kommentar zu "GERT Networks and the Time-Oriented Evaluation of Projects / Lecture Notes in Economics and Mathematical Systems Bd.172"
0 Gebrauchte Artikel zu „GERT Networks and the Time-Oriented Evaluation of Projects / Lecture Notes in Economics and Mathematical Systems Bd.172“
Zustand | Preis | Porto | Zahlung | Verkäufer | Rating |
---|
Schreiben Sie einen Kommentar zu "GERT Networks and the Time-Oriented Evaluation of Projects / Lecture Notes in Economics and Mathematical Systems Bd.172".
Kommentar verfassen